Reconstruction of the boiler house with increasing capacity and engineering networks.
Project duration: 2013.
In project were developed workshop drawings for steel structures on the spatial supports of the OPK and flat frames of the RM trestles of flues, as well as platforms for gas flue maintenance and ladder.
Weight of steel structures is 110,5 tons.
We will contact you shortly!
we will call you soon.